Til innholdet

Oslo Opera House

Delivery of sacrificial anodes to the foundations of Oslo Opera House. The platform surrounding the iconic Opera building is actually built on the sea. Consequently the foundations exposed to sea water is cathodically protected.

Oslo opera house foundations
Oslo opera house foundations – building period 2004.

Owner: Statsbygg
Designer: Snøhetta AS
Built by: Statsbygg
Delivery date: 2006

Cathwell is proud supplier of cathodic protection design and sacrificial anodes.

Oslo opera house - foundation installations
Oslo opera house – foundation installations – building period 2004

The sacrificial anode weights are 32 kg each and connected to the concrete foundations armouring by cables.

Oslo opera house - armouring
Oslo opera house – building period 2004 – armouring to be protected by cathodic protection.

 

Certifications

Navn på sertifisering
Navn på sertifisering
Navn på sertifisering
Navn på sertifisering
Navn på sertifisering
Navn på sertifisering